How long does it take to produce a double-decker carousel. 대개, the production cycle of double-decker carousel varies mainly depending on its size and the complexity of the double-decker carousel, 등. Especially for customized double merry go round. 하지만, here’s a general overview of the production cycle of the double-decker carousel

Manufacturing and Fabrication of double decker merry go round (8-12 weeks)
The production of double layer carousel mainly contains 4 parts. Frame and structure, carousel figures, mechanical systems, 그리고 장식적인 요소.
Production of frame and structure for double decker carousel
Carousel Figures of double layer carousel
우리 모두 알듯이, the production of double carousel horses is the most time-consuming, and it may take 6-8 weeks to produce 20-30 회전 목마 (animal, 마차, 등.) 하지만, for the production of carousel figures, 유리 섬유 is the most important material. 동시에, it may take 1-3 weeks
Mechanical Systems of the amusement park double decker carousel.
It may takes 4-6 weeks to produce mechanical system of the carousel ride. 전체적으로, included but not limited to the rotating platforms, motors, and electrical systems, 등. 더 이상, high quailty and durable.
Decorative Elements for two level carousel ride
Decorative parts like lights, mirrors, paintings, and ornate details are carefully crafted and installed on the carousel. 대개, it may take 2-4 weeks to complete. 하지만, if the decorations are complex(customized images, 데칼, or special themes, 등), it will require more time in the design and production stages
요컨대, the production cycle of the double carousel ride is mainly about 8-12 weeks. 게다가, customized two level carousel may take 12-13 weeks. So if you are considering to buy a double decker carousel for your carnival business, you should plan ahead. 뿐만 아니라, if you are considering to buy a double decker carousel, 자유롭게 연락하십시오 Dinis 더블 데커 회전목마 제조업체.