How long does it take to produce a double-decker carousel. Généralement, the production cycle of carrousel à double étage varies mainly depending on its size and the complexity of the double-decker carousel, etc.. Especially for customized double merry go round. Cependant, here’s a general overview of the production cycle of the double-decker carousel

double decker carousel in Beijng

Manufacturing and Fabrication of double decker merry go round (8-12 semaines)

The production of double layer carousel mainly contains 4 parts. Frame and structure, carousel figures, mechanical systems, et éléments décoratifs.

Production of frame and structure for double decker carousel

It may take you 4-6 weeks to produce basic frame. Par exemple, base and support beams. De plus, the quality of the produced frames must be high. En outre, it needs to bear the weight and motion of two levels. Donc, the production of double-layer carousel frames must be precise

customization options of the carousel.

Carousel Figures of double layer carousel

Comme nous le savons tous, the production of double carousel horses is the most time-consuming, and it may take 6-8 des semaines pour produire 20-30 carrousel (animal, voitures, etc.) Cependant, for the production of carousel figures, fibre de verre is the most important material. En même temps, il peut prendre 1-3 semaines

painting of the double decker carousel

Mechanical Systems of the amusement park double decker carousel.

It may takes 4-6 weeks to produce mechanical system of the carousel ride. En tout, included but not limited to the rotating platforms, moteurs, and electrical systems, etc.. De plus, high quailty and durable.

Decorative Elements for two level carousel ride

installation of the double decker carousel

Decorative parts like lights, mirrors, paintings, and ornate details are carefully crafted and installed on the carousel. Généralement, il peut prendre 2-4 weeks to complete. Cependant, if the decorations are complex(customized images, decals, or special themes, etc.), it will require more time in the design and production stages

En bref, the production cycle of the double carousel ride is mainly about 8-12 semaines. En plus, customized two level carousel may take 12-13 semaines. So if you are considering to buy a double decker carousel for your carnival business, tu devrais planifier à l'avance. En outre, if you are considering to buy a double decker carousel, N'hésitez pas à contacter Dinis double decker carousel manufacturer.