How long does it take to produce a double-decker carousel. عادة, the production cycle of double-decker carousel varies mainly depending on its size and the complexity of the double-decker carousel, إلخ. Especially for customized double merry go round. لكن, here’s a general overview of the production cycle of the double-decker carousel

double decker carousel in Beijng

Manufacturing and Fabrication of double decker merry go round (8-12 weeks)

The production of double layer carousel mainly contains 4 parts. Frame and structure, carousel figures, mechanical systems, and decorative elements.

Production of frame and structure for double decker carousel

It may take you 4-6 weeks to produce basic frame. على سبيل المثال, base and support beams. ما هو أكثر من ذلك, the quality of the produced frames must be high. فضلاً عن ذلك, it needs to bear the weight and motion of two levels. لذلك, the production of double-layer carousel frames must be precise

customization options of the carousel.

Carousel Figures of double layer carousel

كما نعلم جميعا, the production of double carousel horses is the most time-consuming, and it may take 6-8 weeks to produce 20-30 carousel (animal, carriages, etc.) لكن, for the production of carousel figures, fiberglass is the most important material. في نفس الوقت, it may take 1-3 weeks

painting of the double decker carousel

Mechanical Systems of the amusement park double decker carousel.

It may takes 4-6 weeks to produce mechanical system of the carousel ride. All in all, included but not limited to the rotating platforms, motors, and electrical systems, إلخ. ما هو أكثر من ذلك, high quailty and durable.

Decorative Elements for two level carousel ride

installation of the double decker carousel

Decorative parts like lights, mirrors, paintings, and ornate details are carefully crafted and installed on the carousel. عادة, it may take 2-4 weeks to complete. لكن, if the decorations are complex(customized images, decals, or special themes, إلخ), it will require more time in the design and production stages

باختصار, the production cycle of the double carousel ride is mainly about 8-12 weeks. بجانب, customized two level carousel may take 12-13 weeks. So if you are considering to buy a double decker carousel for your carnival business, you should plan ahead. بالإضافة إلى, if you are considering to buy a double decker carousel, please feel free to contact Dinis double decker carousel manufacturer.